CURRENT CONFIGURATION STATUS:

· TRMM is now flying -X forward, nominal ACS nadir pointing control.  
  All events are scheduled high rate 32/2048 on the High Gain Antenna.  
  The solar arrays and HGA are all nominally being controlled by GSACE A.
· TRMM is now flying with the original table 76 in RAM memory, which has the wider software stops of +/- 130°.
· All nominal RTSs and TSMs are verified as enabled and reset (TSMs verified via dump of ACS and SC System Tables #20,
  RTSs verified via telemetry).
· All nominal FDCs and their corresponding actions except 112 and 113 are reset (verified via ACS System Table 106 dump).
  FDCs 112 and 113 will be reset (along with their corresponding actions) after the Delta-V maneuver tomorrow.
· The relay which allows powerup of the instruments and the High Pressure Transducer is now closed,
  allowing for VIRS outgassing process to begin tonight.
· The science data which was on the recorders has been played back to the ground for normal processing.

CURRENT SUBSYSTEM STATUS

· ACS is nominally controlling the spacecraft in Nominal Mode.
· C&DH is nominal.  All real time commanding was accomplished successfully.
· Electrical is nominal, with no unexpected surges or spikes in voltages or currents.
· FDS is nominal, with all tasks functioning properly, including table dumps and clock correlation.
· GSACE/Deployables is now nominal, using GSACE A to control the HGA and the arrays.
  Eclipse operations are using the new software stops and feathering/tracking are nominal.
· Power is nominal, with 100 state of charge being reached following eclipse periods.
· RCS is nominal.  The High Pressure Transducer is off, resulting from the loadshed RTS.
 This will be powered on tomorrow, prior to the Delta-V maneuver.
· RF/COMM is nominal, with good signal during events.
· Thermal is being monitored for out of limits violations.
  Temperatures continue to return to levels which are considered normal for earth pointing operations
  in the -X forward orientation at the current solar beta angle.
· CERES is powered off, and will remain so during remaining recovery efforts.
· LIS is powered off, temperatures are being monitored for out of limit violations.
· PR is powered off, temperatures are being monitored for out of limit violations.
· TMI is powered off, temperatures are being monitored for out of limit violations.
· VIRS is powered off, temperatures are being monitored for out of limit violations.


PLANS FOR TONIGHT

· Continue nominal Data Storage operations.
· Power on VIRS and monitor VIRS outgassing operations and temperatures.


PLANS FOR TOMORROW

· Power on High Pressure Transducer.
· Regular Delta-V maneuver is scheduled for 006-19:10 GMT, with the second burn TBD until tomorrow morning,
  but to occur between 45-55 min after the first burn.  Events have been scheduled to accomadate both burns
  and verification of catbed turnon.
· FDCs 112/113 can be re-enabled on next full event following last burn.
· Remaining instrument power on can begin following maneuver, at approximately 23:00 GMT.
· VIRS outgassing operations should be complete by end of day / early next day TBD.