# # MRR2-04 Maintenance Log # 10/31/15 MW -MRR setup at Bishop Climate Reference Network (CRN) site for OLYMPEX -MRR was connected to 2DVD-SN38 laptop for data collection 12/11/15 0145 Z RW & BJ (~1745 local PST) -pwr outage from 2040 Z (12/10/15, Day 344) to 12/11/15 (noon to 4 local) 12/13/15 2045 Z RW & BJ -laptop was down when we arrived; last data logged at ~0748 UTC -powered up laptop and unit cam back no problems -unit returned to service at ~2053 UTC 01/17/16 MW JZ CJ -MRR pulled - end of IOP -data backed up to external HD