Global Hawk Report

  • Aircraft – green 
    • Monday – Combined System Test
    • Tuesday – Range Test
    • Thursday – high altitude drop test in Range
  • Droposonde – red
    • installed;
    • Solved intermittent IR comm problems (firmware fix)
    • Programmig a new set of instructions
    • CST now schedule for Monday and Low-Altitude test Tuesday and High-Altitude test on Thursday
    • Phil Hall still working COA dropsonde – still do not final disposition but we do have international waters permission
  • HAMSR – green.
  • LIP - green
    • HIWRAP – yellow
    • but can still fly; Need more time on the aircraft to debug .  Software / hardware (bad board or connector) problems.

WB-57 Report

  • Aircraft – green  
  • HIRAD - green
    • delayed on data system upgrades.
    • Ship on 23Monday
    • Arrive on Wednesday,
    • Fly on Thursday as a checkout unless target is in the Gulf. 
    • Calm waters over a buoy at different altitudes
    • Fly precipitation
    • NAST-I will fly on test flight
    • Friday, 27Aug is first science
  • AMPR arrives on 7Sept
  • WB-57 Suitcase flights will be out of MacDill AFB, Tampa FL
  • NAST-I IR interferometer will piggyback during the beginning – don’t have budget for extended

 

DC8 Report

  • Aircraft– green. 
    • Visual and analytical inspection revealed no damage. Plane is ready to fly
  • LASE – green.
  • LARGE – green.
  • APR2 – green. 
    • DAWN – yellow.
    • insulation fix completed.  Will test on first flight opportunity.
    • LaRC personnel working on alternative solutions (adding a fan and heat source in the can – no de-integration required)
  • Microphysics – green
  •  CSI - red
    •  CSI awaiting pylon remanufacture at least another week.  However, inspection needs to be completed before authorized to fly.  Shetter-doubtful that the authorization will be completed during GRIP
  • MMS – green.
  • Dropsonde – green.

 

TD#6 (formerly AL95/PGI-31&33) still far out in east Atlantic. 

Ruled out a suitecase flight to STX

NOAA or NSF are not flying. 

 

Now looking to the Gulf for a possible TS in Tues/Wed?

Secondary objective would be precip, microphysics and DAWN test flight

Alert for 23Aug 2010 @ 19Z  for 9hr flight